ISO 55002 PDCA cycle

English
The following figure shows the relationship between the key elements of an asset management system (PDCA cycle), together with the related clauses in ISO 55001.
PDCA cycle of asset management system
NOTE 1 Only the primary connections are shown to avoid over complexity.
NOTE 2 This does not aim to repeat the distinction between asset management and an asset management
system: it is a connections view showing directions of influence.
NOTE 3 The grey highlighted box designates the boundary of the asset management system.
 
You can also use the infinite improvement model of macrolake as a reference.