The Primary aim of CI pillar is to determine the root cause of the problem in eliminating the 16 major losses.
CI activities encompass all of the 8 TPM pillars.
PM pillar topic is Maintenance or organization of planned Maintenance Activities with the detailed activities being as the followings,
- 
		Periodic Maintenance
 
- 
		Predictive Maintenance
 
- 
		Corrective Maintenance
 
- 
		Breakdown or deployment Maintenance activities.
 
AM pillar topic is Manufacturing with the detailed activities being as the followings,
- 
		Correct operation
 
- 
		Oiling inspection
 
- 
		Cleaning
 
- 
		Tightening
 
- 
		AM data analysis
 
- 
		Restoring
 
- 
		Dealing with...
 
- 
		Minor stoppages
 
- 
		Speed loss
 
- 
		Specification review/Report
 
- 
		Zero defects
 
CI/QM Pillar topic
- 
		8 equipment & 5 manpower losses & Zero defects
 
- 
		Dust free root cause analysis
 
- 
		One stop defect free changeover
 
- 
		Fan In/Fan out